Construction of a New Basin

Construction of a new basin, protecting 145 Ha of water with the creation 140 Ha of new land.

As a summary, the works required:

  • 3,793 m of seawall, made up of:
    • 1,433 m Torres Breakwater
      (rubble mound type)
    • 1,566 m North Breakwater (vertical type)
    • 798 m secondary breakwater
  • 1,365 m of pier with a draft of 23 m
  • 1,650 m of inner embankments in enclosure esplanade

Principal project units:

  • 22,365,000 m³ dredging
  • 21,542,000 m³ quarry run and fill
  • 1,562,000 m³ quarry stones up to 3t
  • 117,600 concrete block ≤ 90 t
  • 4,060 blocks ≥ 145 t
  • 483,214 m³ concrete in caissons (70 units)
Scope of Work

Image by DiamondStream

Construction of a new commercial port

Construction of a new commercial port in the waters of the Atlantic, with the creation of 150 Ha of esplanades and a basin with 232 Ha of protected water.

All together, the works required:

  • 3,358 m of rubble mound breakwater
  • 532 m of secundary rubble mound
  • 461 m of spur breakwater with caissons at a draft of -23 m
  • 908 m of quay with caissons with a draft of 22 m

Principal project units:

  • 18,600,000 m3 of quarry run
  • 16,200,000 m3 of fill in esplanades
  • 3,700,000 t of quarry stones ≤ 2 t
  • 1,100,000 t of quarry stones ≥ 3 t
  • 3,500,000 m3 of concrete
  • 148,500 concrete block ≤ 90 t
  • 22,700 blocks ≥ 150 t
  • 38 reinforced-concrete caissons
Building and Structures

Image by DiamondStream

Maintenance Dredging

  • Maintenance dredging
  • Land reclamation
  • Dumping Rainbowing
  • Sand transportation
  • Other works utilizing trailing hopper suction dredger (TSHD) and cutter suction dredgers (CSD)

Main dimensions:

  • Length overall, m 92.7
  • Width, m 13.5
  • Depth, m 7.30
  • Draft (loaded), m 6.0

Main characteristics:

  • Hopper capacity, m3 2940
  • Speed, kn 10.0
  • Dredging depth, m 25
  • Total power, kW 4080
  • Number of dredging pipes 2
  • EUROPEAN Suction pipe diameter, mm 650
Roads

Image by DiamondStream

Main Project Units

Main project units in this infrastructure:

  • 3,910,000 m3 of dredging on foundation trenches and backfill
  • 5,100.000 m3 of material for land backfill
  • 1,200,000 m3 of quarry run
  • 1,040,000 m3 quarry stones up to 6 t
  • 122,600 m3 concrete in quay caissons (33 units)
  • 4,206 m3 of piles Ø 1.800 mm in quay formation
  • 43,800 m3 concrete in quay superstructure
  • 2,282 m gravel columns ground improvement
  • 2,450,000 m of vertical drains
  • 1,165 m3 accropodes of 6.3 m³
Building and Structures

Image by DiamondStream

Dredger “REDUT”

NameDredger “REDUT”
Dredging work preformed dredging works of big volumes in narrow
port areas, disposal of dredged materials
of all categories, swift movement
Dredging depth 17 meters
Output Depending on soil type and equipment
used as indicated below:

Equipment available on boardQuantityEquipment dimensions
Bucket 3 2.7 cub. m
3.1 cub. m
5.6 cub. m
Arms 2 7.45
3.65
Crane 2 14.0
11.5

Length overall, m 35.45
Breadth, m 14.96
Draft, m 2.15
Roads

Image by DiamondStream

Cutter suction dredger “Antea”

NameCutter suction dredger “Antea”
Counterassembly prouctivity, m3/h1800

Main dimentions:

Main dimentions Length overall, m70
Breadth, m11.50
Draft, m2.6
Dredging depth, m18
Capacity of a power plant, h. p.5400
Capacity of a drive of a mill, kW596